AMG, Inc.
Log in for access to all of the features of AMG-Eng.com.

If you don't already have an account, please register now for instant access.

If you have forgotten your password, we will email a reminder to your registered email address.

Engineering from Concept to Completion

Piping Check-Out

An AMG, Inc., team will perform a walk-down in addition to functionally testing the entire piping system. Activities include:
  • Confirm complete installation of all required parts
  • Perform hydro test
  • Perform pressure test
  • Problem-solve all issues with gaskets, welds, & valves
  • Perform system cleanout
    • Caustic wash/surfactant to remove oil, grease, & other contaminants
    • Detergent flush
    • Acid wash to complete the cleaning process & remove elemental iron from stainless steel surfaces
    • Visually inspect tanks & piping to verify that clean-in-place (CIP) systems are adequate
  • Perform system passivation
  • Chemical wash to protect cleaned stainless steel from chloride attack
Home | AMG Values | Contact AMG, Inc. | Site Map | Privacy Policy | Contact Web Support © 2005 - 2008 AMG, Inc.