Electrical & Instrumentation Calibration & Check-Out

Since many new processing plants install state-of-the-art control systems such as DeltaV, commissioning and start-up include such activities as:
  • Check hardware, including wiring, to ensure that each motor starts from the correct motor control center (MCC)
  • Check software addressing to ensure each motor & instrument responds from the correct icon on the display
  • Start all pieces of equipment
  • Check power supply & functionality
  • Check safety & software interlock sequences using
    • AMG, Inc., written documentation and/or
    • Client-written documentation reviewed by AMG, Inc.
  • Perform system trial runs with water or sacrificial product
  • Tune process control loops, such as temperature, pressure, flow
  • Train operators
  • Perform turn-over